Stop Paying High Bills. Get a Free, Precision Solar Analysis Today →
Behror Solar Asset (1.5 MW)
This project showcases our authority in grid-connection compliance and infrastructure management, ensuring reliable power export from the 1.5 MW Seasonal Tilt asset.
$
The system architecture included precise integration of Switchgear, Circuit Breakers (VCB), and Metering equipment to manage the 11kV/33kV substation output.
Infrastructure Reliability: Managing High-Tension Grid Assets
Successfully managed the integration of the High-Tension (HT) Transmission Line and Transformer assets. This phase required strict compliance to regulatory standards to ensure safe and stable power evacuation into the grid.


Deployed the Seasonal Tilt structure, focusing on precision foundation work and civil integrity necessary to support the entire electrical infrastructure in the specific site conditions.
Power Control Architecture: Metering and Protection
All electrical systems deployed were monitored using robust Protection and Monitoring Equipment protocols, ensuring the asset operates safely and adheres to grid power quality standards.


Behror Solar Asset (1.5 MW)
This project showcases our authority in grid-connection compliance and infrastructure management, ensuring reliable power export from the 1.5 MW Seasonal Tilt asset.
The system architecture included precise integration of Switchgear, Circuit Breakers (VCB), and Metering equipment to manage the 11kV/33kV substation output.
Infrastructure Reliability: Managing High-Tension Grid Assets
Successfully managed the integration of the High-Tension (HT) Transmission Line and Transformer assets. This phase required strict compliance to regulatory standards to ensure safe and stable power evacuation into the grid.
Deployed the Seasonal Tilt structure, focusing on precision foundation work and civil integrity necessary to support the entire electrical infrastructure in the specific site conditions.
Power Control Architecture: Metering and Protection
All electrical systems deployed were monitored using robust Protection and Monitoring Equipment protocols, ensuring the asset operates safely and adheres to grid power quality standards.
Asset Structuring and Strategic Partnership
The 1.5 MW asset required expert navigation of debt financing (Banks/NBFCs). We managed the comprehensive documentation—including DPR and CMA reports—from sanctioning through to final disbursal.
The Behror asset reliably contributes 24.20 Lakh Units annually, validating our expertise in integrating decentralized power infrastructure efficiently and successfully.
Contact


Planck Power, Bank of Baroda building, 4th floor opp Ratlami Namkeen, Vaishali Nagar, Ajmer (Raj)
8854958508
info@planckpower.in
Address
WWW.PLANCKPOWER.IN